Hi,
Select the Component in BOM and go to item detail (F7) for each component, go to Status/Long text tab, make the costing relevancy as blank (Not relevant to costing). Do this procedure for the required components. It will consider for MRP and not relevant for costing.
Regards
Ganesh M