Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8709

Re: Material Ledger Post Closing Process

$
0
0

Hi Atif

 

1. If you activate ML with MM period 201411, the system create records for period 10 and 11

2. If period 201411 is active in MM, you can close period 10 in ML. In general, you only close period N if you change to N+1 period in MMPV

4. I recommend you read this OSS: 1082841 - MMPV: Prevent shifting to a future period by mistake

5. Also, you can read this old post Product Costing with Material Ledger

6. About assign the plant to a costing run, what is the message the system show to you? If the Plant is not available in CKMLCP, i guess you assing this plant to other costing run. In general, you can only assing a plant to one costing run. If you have problems with this, post the screenshot of your system.

 

Arturo.


Viewing all articles
Browse latest Browse all 8709

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>